Plan For Every Part (PFEP)
A detailed overview of all relevant information for each component, such as usage, location, ordering frequency and packaging size, to manage material handling without errors or waste.
A detailed plan for every component used in a production process. This plan covers everything relevant to managing the process without errors or waste. A crucial tool within the Toyota Production System.
A plan includes the part number, characteristics, quantity used per day, precise location where the component is used, ordering frequency, supplier, packaging size, transit time from the supplier, the size and weight of the container and all other relevant information. The aim is to specify every aspect of the handling and use of each component precisely. (Harris, Harris and Wilson 2020.)
Would you like to learn to design a pull system? Pull is one of the four management tools in the Lean Black Belt training. You work with the book Creating Level Pull and test your design in a realistic simulation.