Material handling
The structured movement of materials through a production process, with a Lean material handling system also serving as a means of communicating production instructions and eliminating wasteful activities…
Moving the necessary materials through a production process within a facility.
In a Lean production system, material handling is much more than delivering materials. A Lean material handling system can serve as the primary means of passing on production instructions. A well-designed system can also improve the efficiency of production employees by eliminating wasteful activities such as fetching materials, struggling with items and reaching for materials.
Fixed times, variable quantities
In this type of handling system, a material handler follows a standard route through a factory at precisely defined intervals, for example every twenty minutes. The quantity of material moving through the system each day may vary, but the time interval remains fixed. During the predefined standard route, the material handler collects Kanban cards showing which materials need to be delivered. They then deliver these materials to production locations. This system is often used in combination with a levelling box. The withdrawal intervals in the columns of the box correspond to the time needed to complete the standard material handling route. This type of system is often used for assembly work where a large number of components must be delivered to many different points. It is also known as mizusumashi or waterspider conveyance .
Fixed quantities at variable times
This type of handling system delivers exactly the materials needed, at the right time and in the right quantities, based on signals from downstream locations. The material handler receives a signal to collect material from an upstream process when a trigger point or a predefined stock level has been reached. Because the material handler collects a standard quantity of material from the upstream process, such as one tray, one pallet or one load board, the quantity of material is fixed, while the timing of the transfer depends on demand. This type of system is often used in factories with storage areas for materials produced in batches because changeover times are long. When the cell or machine has used all the material in the storage area, the material handler receives a signal to replenish the quantity consumed from upstream processes.
This type of system is often called a call system or a call-parts system .
It is less common, but possible, to use waterspider transport in combination with fixed quantities at variable times. In this arrangement, the material handler moves back and forth between different production processes, collecting fixed quantities of material from different processes on a route that changes over time.