Our approach

How a programme with LMI works

Every organisation that comes to us has a different challenge. Sometimes it is specific: a process that has stalled, a lead time that is too long, or a team that is not working well together. Sometimes it is less clear-cut: the organisation is growing but its processes are not keeping pace, or improvement efforts have been made for years but have not taken root. What all these situations have in common is that the solution does not lie in a standard programme. An off-the-shelf Lean programme that looks the same for every organisation solves the wrong problem. That is why we always start by understanding what is happening in your organisation before proposing anything.

1

Introduction and diagnosis

The initial meeting is not a sales pitch. It is an in-depth discussion about your organisation: what is going on, what have you already tried, what worked and what did not, and what do you want to achieve?

Our director, René Aernoudts, almost always conducts this meeting himself. With more than 30 years of Lean experience across a wide range of sectors, he quickly recognises where the issues lie and what is needed. This also means that he will tell you if a Lean programme is not the right solution for your situation.

This meeting produces two things: a shared understanding of the issue and an initial impression of which approach would be suitable. Sometimes that is enough to prepare a concrete proposal. Sometimes a short diagnostic phase is needed, during which one of our consultants observes the workplace before we develop a proposal. We never take over the client's role, but we do keep asking questions until we see that the problem has been defined correctly.

2

A proposal tailored to the challenge

Based on the initial meeting, we develop a proposal. This proposal is always tailored to your needs, but the building blocks are familiar. Depending on what your situation requires, we use one or more of the following interventions. An important first step is often a strategic A3 for the organisation.

Kaizen event

A five-day Kaizen event in which a small, cross-functional team maps the entire value stream, analyses the bottlenecks and draws up a concrete action plan. Suitable when the challenge is clearly defined and there is a need for rapid insight and momentum. At the end of the week, the team presents its findings to management, including an implementation plan in A3 format.

Lean training programmes

If the focus is on the need for knowledge and improvement capacity, we provide in-company training at various levels: Orange Belt as an introduction, Green Belt to lead improvement projects independently, and Black Belt for issues that span multiple departments. Naturally, we can also create bespoke training programmes tailored specifically to the needs of your organisation.

Wave programme

For front-line managers and teams who want to learn how to apply Lean every day: a short training module every two weeks, immediately followed by practical application in their own workplace. At least 75% of the time is devoted to application, and no more than 25% to theory.

Strategic A3 and Obeya

If the issue is at a higher level, we work with the executive board or management team on a strategic A3 and make it visible in an Obeya: a shared control room where all relevant management information can be seen at a glance. This is a good first step if members of an executive board or management team have different views of what the challenge actually is.

3

Implementation in practice

Our approach is hands-on. We work where the work takes place: on the production floor, at the service desk, on the construction site, in the department and sometimes at our client's customer. We call this the Gemba, Japanese for "the place where value is created".

There, we observe things that are not always included in a report. We work with the people who do the work and jointly develop insights and ideas for improvement. When people face the problems, investigate the root causes, consider possible countermeasures and test them in their own working environment, they learn from the process and sustain the results.

At the same time, we contribute potential solutions ourselves. A team knows its own work best, but it is not always familiar with methods that have already proved successful elsewhere. Part of our work is to put these possibilities on the table, allowing the team to choose and test what works in its own situation.

Our consultants help people create, present and implement their own improvement plans. They assist with testing and introducing new working methods into daily practice, provide coaching when needed and ensure that the results are sustained.

4

Sustainment, essential but underestimated

The most difficult phase begins when the programme is "finished" and people actually have to start working differently. This is when everyday pressures return and the new way of working does not yet feel natural.

That is why our involvement does not end with the design. With a new production line, we do not stop at a drawing. We help set up the line and make it operational, including training and coaching the people during implementation.

We also provide explicit support during the subsequent phase: follow-up sessions after 30, 60 and 90 days, coaching for line managers and internal improvement specialists as they achieve their own ambitions, and a support pass that allows teams to request assistance when they need it.

Our goal is to create an organisation that can continue improving on its own. That is not the same as no longer needing us. Many clients continue to engage us for matters where outside experience makes a difference, and there is nothing wrong with that.

What you can expect from us

01

We work on your people and your processes

We are committed to making your organisation successful, and that requires developing both at the same time: the processes that support the work and the people who run them. Improving a process without enabling people to learn produces a result that fades away as soon as we leave.

02

Lean in a Lean way

We apply the same approach to our own work that we bring to your organisation. First, we jointly determine what constitutes value for your customer. We then map the steps that contribute to it, remove everything that adds no value and only deploy what you need at that moment. These are the five principles of Lean, applied to ourselves. As little as possible, as much as necessary, and we invoice based on the work actually performed.

03

Short when possible, multi-year when beneficial

A Kaizen event takes weeks, after which we leave again. We have worked with many clients for years. Because we know the organisation, its people and its challenges, we can choose a suitable direction more quickly, set it in motion and ensure that it is sustained.

Ready to get started?

The initial meeting is informal, with no obligation, and focuses on the substance of your issue. Call our director, René Aernoudts, directly or send a message via the contact form. René will be happy to discuss your issue with you, without this having to result in a proposal.

Or call René Aernoudts (Directeur / eigenaar) directly on 06 50 20 64 38

René Aernoudts