Push production
Producing large batches based on anticipated demand and pushing them on to the next process, regardless of that process's needs or capacity.
Producing large batches of items as quickly as possible, based on anticipated demand, and then pushing those items on to the next downstream process or storing them, regardless of the production rate of the next process. Such a system makes it virtually impossible to achieve the smooth flow of work between one process and another that is characteristic of Lean production.